|  | Rail Road Ties - Vertical Design
 
 1985: Vertical Tie Design 
Huntington, New York
 ITEM- RRT - 10
 
 
Stage 1 - Property Plan and site survey.Stage 2 - Site preparation to include removal of old; bush, shrubs and roots  with our Bobcat.  Complete Demolition of all old wall structures. Latter all  debris was hauled to land fill and discarded.Stage 3 - Bobcat used to backfill behind all walls after construction was completed. Vertical Wall Design built in the front of a home along walk and bed.  All timbers used were; 30 year cca, grade 1, pressure treated lumber. |  |